@inproceedings{ede732b6b4c64fc5addff7a0234e42d0,
title = "An S-graph based approach for multi-mode resource-constrained project scheduling with time-varying resource capacities",
author = "O. Ooz and M. Hegyhati",
year = "2018",
language = "Undefined/Unknown",
series = "23rd International Congress of Chemical and Process Engineering, CHISA 2018 and 21st Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2018",
publisher = "Czech Society of Chemical Engineering",
pages = "955",
booktitle = "23rd International Congress of Chemical and Process Engineering, CHISA 2018 and 21st Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2018",
note = "23rd International Congress of Chemical and Process Engineering, CHISA 2018 and 21st Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2018 ; Conference date: 25-08-2018 Through 29-08-2018",
}