@inproceedings{883efd7f2fd34c499544f59b6965c5f1,
title = "Batch process scheduling with eS-graph: A case study: A case study",
author = "M. Hegyhati",
year = "2018",
language = "Undefined/Unknown",
series = "23rd International Congress of Chemical and Process Engineering, CHISA 2018 and 21st Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2018",
publisher = "Czech Society of Chemical Engineering",
pages = "952",
booktitle = "23rd International Congress of Chemical and Process Engineering, CHISA 2018 and 21st Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2018",
note = "23rd International Congress of Chemical and Process Engineering, CHISA 2018 and 21st Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction, PRES 2018 ; Conference date: 25-08-2018 Through 29-08-2018",
}